Texas Instruments HALL-HMI-ROCKER-EVM Evaluation Module
Texas Instruments HALL-HMI-ROCKER-EVM Evaluation Module facilitates the evaluation of Hall-effect switches housed in the SOT-23 package in a rocker switch human-machine interface (HMI) module. The HALL-HMI-ROCKER-EVM exhibits three different switches by the designs presented in the HMI Rocker Switch with Hall-Effect Switches application note. The HALL-HMI-ROCKER-EVM Evaluation Module demonstrates the DRV5033FAQDBZ, DRV5033AJQDBZ, and DRV5032ZEDBZ.Features
- Rocker switches demoing DRV5033FAQDBZ, DRV5033AJQDBZ and DRV5032ZEDBZ
- Rocker switch design details provided in HMI rocker switch with hall-effect switches application note
- 3D-print source files are available for customization
Hardware
PCB Layout
Published: 2022-05-24
| Updated: 2023-10-27
